| Team
consists of highly skilled Test & Commissioning engineers,
who can perform Software validation and verification, Stand alone
testing
of network elements, Link testing of; PDH / SDH / DWDM networks,
Mobile networks - MSC, BSC, BTS, microwave, GSM, GPRS, UMTS.
Specialised
works under this group are: |
In
RF networking, system design and configuration of RF Equipment is
carried out to meet the desired network objectives like coverage
and density criterion. Appropriate software packages are used to
design and optimize the network. Some of the currently used packages
are Pathloss, NetPlan / MSI-Planet / dBPlanner. These packages are
upgraded and new packages are acquired from time to time to equip
the company to meet the ever-increasing complex and stringent requirements
of the networks.
The objectives of RF networking are to: |
- Design
Cellular networks.
- Plan
network expansions (e.g. Cell splitting, Channel additions).
- Optimize
network performance (e.g. Operational analysis).
- Diagnose
performance problems (e.g. Interference analysis).
|
| Microwave
Radio Surveys are done for the planning of Microwave Line of sight
links between point to point or point to multipoints. The objectives
of Microwave link Radio Survey is: to select the site (Radio equipment
and tower locations); operational frequency band. Development of
path profiles to determine the height of radio tower. Analyzing
the reflections, refraction and diffraction of the signals. Calculations
of path loss. Deciding Equipment configuration. |
| Reliability
analysis: |
| The
objective of carrying out reliability analysis is to estimate the
non-availability or outage of the link per annum. Reliability analysis
takes into consideration the parameters of fade margin, diffraction
loss, average annual temperature, fade occurrence factor, terrain
roughness calculations, radio parameters, antenna parameters, transmission
line and other miscellaneous losses |
| Interference
analysis is carried out to find the interference caused at the site
by the different RF signals received at the location. Information
like the inter site distance, orientation between the transmitters,
the free space loss and the side lobe levels etc. is used for the
interference calculations. Interference signal level is aimed at
appropriate level below the receiver threshold to eliminate the
effect of interference. In some cases, cross polarisation and use
of high performance antenna are considered to minimize the interference |
| In
the infrastructure services, selection of site, design and construction
of foundation for towers and the building of towers as per the requirements
of the customer is carried out. |
Site
surveys are carried out to determine the feasibility of using a
site for the equipment to be installed like a BTS of a cellular
network, a VSAT terminal of a Satcom network or Microwave Radios
for a backbone network.
In the acquisition of data for the given location, geographical
data like latitude and longitude, surrounding clutter data like
buildings, trees and AMSL are collected. Other data include data
links (MW links, PCM, OFC etc.), generator capacity, battery capacity,
AC facility, approach to the site, and possible location of the
equipment in the given building is collected. If a tower exists,
feasibility of mounting the antenna on the tower is assessed. If
not, feasibility of erecting a new tower (ground based / rooftop)
is studied. The collected data is used to identify the best possible
location for the proposed equipment.
For example, the best possible building for locating a BTS is based
on the building height, access road to the site, availability of
access to the roof top for carrying the equipment, provision for
building of a tower and availability of space for DG set etc. In
all the surveys photographs from various angles are taken to give
a general idea about the surrounding clutter. The data supplied
is the input to the RF planning tool like MSI Planet and
MOTOROLA NET PLAN. |
Pre
installation: This test is carried out to determine the location
of the new site. With the drive test, the required heights of GSM
antenna can be predicted and the coverage area within the vicinity
of the transmitter can be estimated.
The following equipment are used for Prop test: |
1.
Transmitter
2. Power supply
3. Omni antenna
4. Drive test kit (UPS, Laptop, Computer and TEMS or equivalent
Software)
5. Engineering Mobile Phone Post Installation: |
| Similarly
this test is carried out to check and maintain the health of the
existing network. It is performed to check the following parameters: |
1.Coverage
of the network
2.Checking of interference (Co channel & adjacent channel)
3.Optimization
4.Future RF planning Coverage analysis: |
The
coverage analysis is carried out to ensure the availability of RF
signal in area of influence of the given radio transmitter. This
is done after the RF Network is realized.
Practical Radio survey is done with the help of spectrum analyzer
and a receiving antenna setup in a vehicle, which is driven
in all the
areas of the zone. The signal levels are plotted on the digital
map, which indicates the location of voids / fade spots in the
network. |
It
is mandatory as per municipal bye-laws any existing structure subjected
to additional loads shall be verified and certified by a competent
structural engineer. For erecting a communication tower on the building,
it has to be certified for stability against additional loads including
tower, roof top DG sets and fully loaded equipment shelter.
The main structural members such as columns and footings have to
be analysed for the additional loads. The analyses includes study
and ascertaining the quality of concrete, steel reinforcement. Study
of certified drawings, rebar location tests, physical measurement
of columns, beams, floor load, occupancy etc., would give necessary
information. Following tests would be performed for analysis; |
-
Ultrasonic pulse velocity test
- Profometer measurement
- Partial destructive tests |
| Structural
study is also essential based on the periodic maintenance or post
heavy storm or an earthquake. Mack Telecom is geared up to provide
the structural engineering services keeping Operator's long term
interest in infrastructure and safety factor in mind. |
|